After letting the countertop cure for a day, it was time to start putting it all back together! This wasn’t so simple as we decided to flip the sink around (which required some wood to be cut) and then had to redo the drain pipes when I dropped a piece overboard while trying to clean it. Getting all the screws back in to secure the sink took a LOT of boat yoga and patience. We also installed an in-line water filter under the sink (love it!) and a new faucet with a pull-out sprayer (love that, too!). I really can’t thank the Captain enough for all of his hard work on this project! I still have to put everything in its final place, but I’m calling this project complete!
Installing all the new goodies!
It’s done! Love it!
And not a moment too soon! Today we left Herrington Harbour South after a wonderful, productive visit and headed to Herrington Harbour North to get hauled out sometime this week. It was fun checking out our sister marina, not so fun starting an engine coolant line project only to find that some of the parts need to be special ordered. More to be done on that later!
Kids handled lines while I drove the car, then enjoyed the perks of HHN!
Grrr...that stupid piece of after-market metal needs to go!
No comments:
Post a Comment